Avery Close, Leighton Buzzard, LU7 4UP, PulsaCoil 2000

We have created this Thermacoil Installation Case Study page to enable you to see before and after images of a typical installation. Avery Close, Leighton Buzzard, LU7 4UP, PulsaCoil 2000 Replacement Case Study features a residential development made up of 33 high quality one and two bedroom apartments that are a short walk from the town centre. Miss E is just one of the many customers that we work for in this area.

Avery Close, Leighton Buzzard, LU7 4UP, PulsaCoil 2000 Replacement Case Study

Miss E came into contact with The Plumbing Group Limited when one of her tenants was without hot water. Our engineers arrived at the property and examined the boiler. They quickly discovered that the unit had a split cylinder. In this case the unit has to be replaced instead of repaired as it is deemed beyond economical repair.

Luckily, the engineer was able to carry out a temporary until he was able to fit the new unit.

Miss E opted for a Fabdec ThermaCoil as her replacement as opposed to the PulsaCoil PCS. The Thermacoil is a far less complicated system than the PulsaCoil. This is because the PulsaCoil contains many components, which includes a Printed Circuit Board, Pump, Sensors and Relays. The ThermaCoil however, has replaced all this and now only uses a single mechanical blending valve. For the user of the system it is no different but for long term maintenance it is much simpler.

Our engineers removed the old PulsaCoil and disposed of it correctly before finally installing the new boiler. Miss E was shown how to maintain and operate her new ThermaCoil once the engineers were finished. Overall the job was completed efficiently and in under four hours.

Miss E was overjoyed with the work done by our engineers.

The new ThermaCoil comes with a 10 Year Manufacturers cylinder warranty, for further details visit www.thermacoil.co.uk